pull-out
英 [ˈpʊl aʊt]
美 [ˈpʊl aʊt]
n. (报刊等的)可取出插页; (军队的)转移,撤离; (机构的)撤销
复数:pull-outs
牛津词典
noun
- (报刊等的)可取出插页
a part of a magazine, newspaper, etc. that can be taken out easily and kept separately- an eight-page pull-out on health
八页的保健插页 - a pull-out guide
活页指南
- an eight-page pull-out on health
- (军队的)转移,撤离;(机构的)撤销
an act of taking an army away from a particular place; an act of taking an organization out of a system
柯林斯词典
- N-COUNT (报纸或杂志中的)活页
In a newspaper or magazine, apull-outis a section which you can remove easily and keep.- ...an eight-page pull-out supplement.
有8页活页的副刊
- ...an eight-page pull-out supplement.
- N-SING (军队的)撤出,撤退
When there is apull-out ofarmed forcesfroma place, troops which have occupied an area of land withdraw from it.- ...a pull-out from the occupied territories...
从占领区撤军 - The pull-out of the army paves the way for independence.
军队的撤出为独立铺平了道路。
- ...a pull-out from the occupied territories...
双语例句
- Field pull-out tests and failure model of GFRP screw anchors used to stabilize canal slopes of expansive soils
玻璃钢螺旋锚用于稳定膨胀土渠坡的现场拉拔试验和锚筋的破坏形式 - The drawers have reliable mechanical interlock, pull-out and push protection and clear position indications for be close, test, withdraw or isolation.
抽屉设有可靠的机械联锁装置和拉出、插入保护装置,并具有明显的合闸、试验、抽出和隔离位置指示。 - The pull-out of the army paves the way for independence.
军队的撤出为独立铺平了道路。 - Single fiber pull-out test and the determination of critical fiber reinforcement length for fiber reinforced soil
纤维加筋土中单根纤维的拉拔试验及临界加筋长度的确定 - They called for the pull-out of all foreign troops at an unspecified date.
他们要求在某个未确切指定的日期撤走一切外国军队。 - Biomechanical study on the Pull-out strength of pedicle screws
椎弓根螺钉抗拔出强度的生物力学测试 - Study on Pull-out Test of Gabion Reinforcement Filled with Red Sandstone
格宾材料在红砂岩填料中的拉拔试验研究 - Axial pull-out capacity and bonding slip behavior of connections between prestressed concrete pipe pile and pile cap
预应力混凝土大管桩与桩帽连接的轴拔性能和粘结滑移特性 - The influence of mixture ratio of grouting material on the pull-out behaviors of rock cable is obvious, which is one of key parameters for the optimal design of prestressed anchorage systems.
注浆体配合比是预应力锚固体系优化设计的关键参数之一,对岩锚抗拔特性影响显著。 - Researches on pull-out capacity calculating method of rock bolt foundation
岩石锚杆基础抗拔承载力计算方法探究
