八八字典>英语词典>constrains翻译和用法

constrains

英 [kənˈstreɪnz]

美 [kənˈstreɪnz]

v.  强迫; 强制; 迫使; 限制; 限定; 约束
constrain的第三人称单数

柯林斯词典

  • VERB 约束;限制;强迫
    Toconstrainsomeone or something means to limit their development or force them to behave in a particular way.
    1. Women are too often constrained by family commitments and by low expectations...
      女性往往受到家庭责任和低期望值的束缚。
    2. How can we produce top-class engineers when universities are constrained to offer salaries that can only attract mediocre staff?...
      大学的财力有限,提供的薪酬仅能吸引水平一般的教师,在这种情况下,我们如何能培养出一流的工程师?
    3. It's the capacity of those roads which is going to constrain the amount of travel by car that can take place.
      制约驾车出行量的将会是那些道路的通行能力。
  • PHRASE 觉得被迫(做某事)
    If youfeel constrained todo something, you feel that you must do it, even though you would prefer not to.
    1. For some reason he felt constrained to lower his voice.
      不知怎么的,他觉得自己必须得压低声音。

双语例句

  • The result shows that the stability of reward system constrains conflict behavior very well.
    结果表明,KIBS企业内部报酬体系的稳定性对冲突行为抑制作用明显;
  • I use dry ice to test the physical constrains of certain metals.
    我用干冰来检测几种金属的物理强度。
  • A business rule is a statement that defines or constrains some aspect of a business.
    业务规则是对业务的某个方面进行定义或约束的语句。
  • Research of the job-shop scheduling problem with due date and capacity constrains
    基于交货期和设备能力约束的作业车间调度方法研究
  • It constrains what's inside.
    把里面的都限制移动了。
  • A derived simple type constrains the values of its base type.
    派生的简单类型约束了基类型的值。
  • In this manner, the committee's input constrains the administrator's discretion.
    从这个角度,咨询委员会的引入抑制了行政官员的裁量权。
  • Generating subdivision surfaces with complicated curve interpolation constrains is a concerned topic for computer graphics and geometric modeling.
    带有复杂型曲线插值约束的细分曲面的生成,是计算机图形学及几何造型技术等领域所关心的一个问题。
  • In addition, centered ownership structure neither constrains overinvestment nor promotes the effective investment in non-state-holding enterprises.
    此外,居中的股权结构既不能抑制非国有控股企业过度投资,又不能促进企业有效投资。
  • In this paper a new exact algorithm is proposed for solving project scheduling problems under multiple resource constrains which is based on the branch and bound procedure.
    基于分支定界法的思想提出了一种新的精确求解多资源约束下项目进度规划问题的最优化算法。