bosh
英 [bɒʃ]
美 [bɑʃ]
n. 胡说;胡思乱想
v. 瞎说;胡扯
过去分词:boshed
英英释义
noun
- pretentious or silly talk or writing
双语例句
- Bosh continuous succeeded, James hit a record in the drift after the buzzer, the Heat again until the43-39 advantage.
波什连续得手,詹姆斯在飘移中投中一记压哨球后,热火才以43-39重新取得优势。 - I see more Dirk than Bosh. I'll take either though. I too was encouraged.
我看易像德克比像波什多些。随便像谁我都愿意。我也被易的表现所鼓舞。 - The slag forming process occurs in stage of primary slag, bosh slag, tuyere slag and tapped slag, among which the most important stage is the bosh slag.
高炉造渣过程经历初渣、炉腹渣、风口渣和终渣等几个阶段,其中对高炉强化最重要的阶段是炉腹渣。 - As the rate of pulverized coal injection into the blast furnace is constantly increasing, it is required to reduce the amount of bosh slag and to improve its fluidity by any means.
随着高炉喷煤量的不断增加,要求千方百计减少炉腹渣量和改善炉腹渣的流动性。 - He was injured late in the fourth quarter of Game One as he competed for the ball with Heat's Chris Bosh, forcing him to wear a splint on his damaged finger for the rest of the series.
他在第一场第四节后半段与热队的克里斯•波什争球时受伤,这使他不得不在这系列赛的剩余场次中都带着固定有小木板的受伤手指上阵。 - For example, cooling water circulate constantly through the tuyere, hearth staves, bosh and inwall cooling plate etc. Measures for prolonging Service Life of the Soft Water Closed Circuit Circulation Cooling System for BF Cooling Stave
例如,冷却水不停地在风口、炉身、炉腹和内壁冷却板等部位循环流动。延长高炉冷却壁软水密闭循环冷却系统使用寿命的措施 - There is speculation that Mike Miller may join Wade, James, and Bosh, in Miami, and if this is true, then the already limited options for the cash-strapped Lakers grow even slimmer.
还存在着一种猜测,迈克米勒将联手新三巨头,如果这则传闻是真的话,那么对于本来就资金缺乏的湖人来说选择就越来越少了。 - But, heavy leakage of bosh cooling staves not only shortens BF service life, but also hinders normal operation.
而炉腹冷却壁大量破损和漏水,不仅缩短高炉寿命,也威胁安全生产。 - Also, now that he's sharing the floor with Dwayne Wade and Chris Bosh, there is no reason for him to force the issue.
而且,他现在和韦德以及波什共同在场上,没有理由要他来面对这些了。 - Sialon bonded silicon carbide bricks, characterized by good resistance to oxidation and alkali corrosion, are mainly used on the underside, belly and bosh of blast furnace.
赛隆结合碳化硅砖具有优质的抗氧化和抗碱侵蚀性,主要用于炼铁高炉的路身下部、炉腰和炉腹等部位。
